Overwater construction operation platform

The utility model discloses an overwater construction operation platform which comprises at least four piles, and sleeves are installed on the piles. The positioning column is mounted in the sleeve; the working table plate is mounted on the positioning columns, a reinforcing frame is arranged on the...

Full description

Saved in:
Bibliographic Details
Main Authors LIU QIAN, ZHANG TAO, ZHANG BIN, SUN YAOWEN, FAN DANDAN, DING JIANAN, GUO XICUN, LIU QISEN, YANG JIANTING, YANG ZHANPO
Format Patent
LanguageChinese
English
Published 19.09.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model discloses an overwater construction operation platform which comprises at least four piles, and sleeves are installed on the piles. The positioning column is mounted in the sleeve; the working table plate is mounted on the positioning columns, a reinforcing frame is arranged on the outer side of the working table plate, a plurality of pairs of connecting rods and a plurality of pairs of mounting frames are detachably arranged on the frame edge of the reinforcing frame, and floating balls are arranged at the ends of the connecting rods; and the limiting assemblies are installed at the bottom of the working table plate, located on the two sides of the positioning columns and used for limiting descending of the positioning columns. By arranging the limiting assembly, the floating plate and the floating ball, the working platform can move upwards along with the water surface during flood tide and normally play a role, meanwhile, by arranging the mounting frame, the connecting function of the wor
Bibliography:Application Number: CN202320807766U