Quickly-installed steel structure elevator shaft corridor structure
The utility model relates to a steel structure elevator shaft corridor structure capable of being installed quickly. Comprising a straight corridor connecting end, a vertical-column-free straight corridor, a corridor hanging plate, a corridor baffle and a corridor connecting plate. The method is cha...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
25.08.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model relates to a steel structure elevator shaft corridor structure capable of being installed quickly. Comprising a straight corridor connecting end, a vertical-column-free straight corridor, a corridor hanging plate, a corridor baffle and a corridor connecting plate. The method is characterized in that the steel structure hoistway and the straight corridor connecting end are formed in a welding mode and then sent to the site, the vertical-column-free straight corridor is located in a lap joint mode through the corridor hanging plate and the corridor baffle, the corridor is more convenient and rapid to hoist, the corridor and the steel structure are connected together, then bolted connection is conducted through the corridor connecting plate and the high-strength bolt, and the construction efficiency is improved. And welding treatment is carried out. Therefore, errors caused by measurement during field installation or errors generated during production can be adjusted. The corridor installation |
---|---|
Bibliography: | Application Number: CN202222071595U |