Dike foot scour prevention reinforcing and strengthening structure
The utility model discloses an embankment foot scour prevention reinforcing structure, and belongs to the technical field of embankment foot scour prevention reinforcing structures. The high-strength reinforcing structure is arranged at the top of the embankment foot; the high-strength reinforcing s...
Saved in:
Main Authors | , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
01.08.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model discloses an embankment foot scour prevention reinforcing structure, and belongs to the technical field of embankment foot scour prevention reinforcing structures. The high-strength reinforcing structure is arranged at the top of the embankment foot; the high-strength reinforcing structure comprises a placing sleeve attached to the top of the embankment foot, a through hole is formed in the bottom of the placing sleeve, a mesh is fixedly connected into the through hole, a stone layer located in the placing sleeve is laid on the top of the mesh, and the top of the stone layer is filled with matrix soil. And the matrix soil is filled in the placing sleeve. Soil of the embankment foot can be firmly grabbed through mutual cooperation of the inserting rod and the protection green plant root system, then the soil of the embankment foot is prevented from being lost easily, protection on the embankment foot can be efficiently reinforced, and compared with an existing reinforcing mode with the poor r |
---|---|
Bibliography: | Application Number: CN202321144002U |