Temporary plugging structure for building settlement post-cast strip

The utility model discloses a temporary plugging structure for a building settlement post-cast strip, which comprises a connecting assembly comprising a plurality of connecting pieces fixed on casting sections on two sides of the post-cast strip in rows along the length direction of the post-cast st...

Full description

Saved in:
Bibliographic Details
Main Authors WANG ZHIBO, PANG ZHAOKUN, WANG DAIBING, FAN XIAOTING, GUO QINGTENG, WANG FEIYU
Format Patent
LanguageChinese
English
Published 02.05.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model discloses a temporary plugging structure for a building settlement post-cast strip, which comprises a connecting assembly comprising a plurality of connecting pieces fixed on casting sections on two sides of the post-cast strip in rows along the length direction of the post-cast strip; the two ends of the reinforced concrete cover plate are fixed to the multiple connecting pieces of the pouring sections on the two sides correspondingly. The concrete building blocks are fixed between the adjacent connecting pieces of the pouring section on each side, the lower surface of the reinforced concrete cover plate is attached to the upper surfaces of the concrete building blocks, and under the condition that the post-pouring belt is temporarily blocked, movable loads brought by walking of people can be borne. 本实用新型公开了一种建筑沉降后浇带临时封堵结构,包括:连接组件,包括沿后浇带长度方向成排固定于所述后浇带两侧浇筑段的多个连接件;钢筋混凝土盖板,所述钢筋混凝土盖板的两端分别与两侧浇筑段的多个所述连接件固定;混凝土砌块,固定于每侧浇筑段的相邻所述连接件之间,所述钢筋混凝土盖板的下表面与所述混凝土砌块的上表面贴合,能够在对后浇带进行临时封堵的情况下,具有承载人员行走带来的活动载荷。
Bibliography:Application Number: CN202223082401U