Turnover type heavy-load steel plate temporary road

The utility model relates to the technical field of pavement construction, in particular to a turnover heavy-load steel plate temporary road. Comprising a rammed earth layer and a plurality of steel plate pavements, a pouring layer is laid on the top of the rammed earth layer, a plurality of I-beams...

Full description

Saved in:
Bibliographic Details
Main Authors LI FUSONG, HAN HONGWEI, SONG SHENGLIN, GUAN YONGWEI, ZHANG KAIYUAN, ZHU JIANGE, GOU XIAOBIN
Format Patent
LanguageChinese
English
Published 13.01.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model relates to the technical field of pavement construction, in particular to a turnover heavy-load steel plate temporary road. Comprising a rammed earth layer and a plurality of steel plate pavements, a pouring layer is laid on the top of the rammed earth layer, a plurality of I-beams are fixedly installed on the pouring layer at intervals, every two adjacent I-beams are fixedly connected through connecting angle steel, and the steel plate pavements are fixedly installed at the top ends of the I-beams. Every two adjacent steel plate pavements are fixedly connected through a steel plate welding gasket, a drainage ditch is fixedly installed on the outermost side of the road, the top end of the drainage ditch is covered with a drainage ditch cover plate, and the space between the steel plate pavements and the connecting angle steel is filled with a water stabilizing layer. The method has the advantages of saving energy consumption, reducing the use amount of concrete and saving a large amount of w
Bibliography:Application Number: CN202222223557U