Existing tunnel simulation monitoring device for double-track tunnel excavation
The utility model provides an existing tunnel simulation monitoring device for double-track tunnel excavation. The existing tunnel simulation monitoring device comprises a simulation box; the partition plate is fixedly mounted on one side of the interior of the simulation box, and a simulation tunne...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
27.12.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model provides an existing tunnel simulation monitoring device for double-track tunnel excavation. The existing tunnel simulation monitoring device comprises a simulation box; the partition plate is fixedly mounted on one side of the interior of the simulation box, and a simulation tunnel segment is arranged at the top of the partition plate; the two connecting seats are fixedly connected to one side of the top of the simulation box; and the folding frame is arranged on one side of the simulation box. According to the existing tunnel simulation monitoring device for double-track tunnel excavation, one side of the folding type frame extends into the simulation box, then water is injected into one side of the folding type frame, the situation that a large amount of underground water exists during tunnel excavation can be simulated in the simulation box, and after the position of the folding type frame is adjusted, the position of the folding type frame is adjusted. By means of the structure, the con |
---|---|
Bibliography: | Application Number: CN202222764601U |