Track trunking and trunking group

The utility model relates to a track wire duct and a wire duct group, the track wire duct comprises a bottom wall and two side walls oppositely arranged along the width direction, the bottom wall is provided with a first end and a second end along the length direction of the wire duct, the first end...

Full description

Saved in:
Bibliographic Details
Main Authors LIANG CHAOYUE, CHENG KANGNING, YANG FANGQIU, CHE HONGXING
Format Patent
LanguageChinese
English
Published 06.09.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model relates to a track wire duct and a wire duct group, the track wire duct comprises a bottom wall and two side walls oppositely arranged along the width direction, the bottom wall is provided with a first end and a second end along the length direction of the wire duct, the first end is fixedly connected with the side walls, the first end is provided with a first connecting piece, and the second end is provided with a second connecting piece; the second end is configured to be capable of being lifted upwards relative to the first end, and the second end is provided with a second connecting piece used for being installed and matched with the first connecting piece. According to the technical scheme, the trunking can better adapt to the change of the mounting gradient of the track, and the universality of the trunking for the track is improved. 本公开涉及一种轨道用线槽及线槽组,其中的轨道用线槽包括底壁和沿宽度方向相对设置的两个侧壁,底壁沿线槽的长度方向具有第一端和第二端,第一端与侧壁固定连接,且第一端上设置有第一连接件,第二端配置成能够相对于第一端向上抬升,且第二端上设置有用于与第一连接件安装配合的第二连接件。通过上述技术方案,使得线槽能够更好
Bibliography:Application Number: CN202221003445U