Tool for installing universal mooring equipment of three-stand-column floating type wind power platform

The utility model discloses a tool for installing universal mooring equipment of a three-stand-column floating type wind power platform, which comprises a dummy shaft, and one end of the dummy shaft is connected with a pull ring; annular fixing grooves are formed in the positions, close to the two e...

Full description

Saved in:
Bibliographic Details
Main Authors LIU JUNFENG, ZHOU XIULONG, YI KAN, CHEN XINQUN, MOU HAIGANG, XIANG XIN, TENG HUADENG, CHEN KAIFENG, HUANG SHAOXING, XIONG RENSHU, XU XINXIN, FANG ZIBIAO, GU YUMENG, LIU AIHUA, FU LIJING, TANG CHENG, XU YUAN, DENG CAIRONG, LIN CHENGDI, NI DAOJUN, LI ZHENGWEN, WANG WEI, LIU YUNZHI, HUO XUJIA, DONG MINGZHI, XUE YANGYANG
Format Patent
LanguageChinese
English
Published 02.08.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model discloses a tool for installing universal mooring equipment of a three-stand-column floating type wind power platform, which comprises a dummy shaft, and one end of the dummy shaft is connected with a pull ring; annular fixing grooves are formed in the positions, close to the two ends, of the outer surface of the dummy shaft and clamped with the first shaft ring. Threaded holes distributed annularly are formed in the two ends of the dummy shaft. A shaft gasket sleeves the outer surface of the dummy shaft; the shaft sleeve is in contact fit with the mounting surface; two ends of the dummy shaft are connected with the support. The tool solves the problems that in the prior art, when mooring equipment is installed, concentricity is difficult to guarantee, abrasion of an anchor chain is large, and the structure is overloaded, precision among all the equipment can be controlled, therefore, abrasion of the anchor chain and overload of the equipment are reduced, construction efficiency is greatly i
Bibliography:Application Number: CN202220436053U