Formwork structure for integral pouring of floor slab and steel beam
The utility model discloses a template structure for the integral pouring of floor slab and steel beam, including truss, steel beam, angle steel, first template, second template and third template, angle steel is fixed on steel beam, first template is vertically detachable connection on angle steel,...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
28.06.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model discloses a template structure for the integral pouring of floor slab and steel beam, including truss, steel beam, angle steel, first template, second template and third template, angle steel is fixed on steel beam, first template is vertically detachable connection on angle steel, first template is arranged on one side of steel beam, every two adjacent angle steel forms a gap, the second template is fixed on the truss, and the third template is fixed on the second template. The second formwork is arranged below the steel beam, the third formwork is fixedly connected with the second formwork, an integral structure formed by fixedly connecting the third formwork and the second formwork is detachably connected to the first formwork, and the steel beam is wrapped by the first formwork, the second formwork and the third formwork. When the truss is integrally poured into a floor slab, concrete pouring is carried out on the steel beams on the columns at the same time, waterproof, anti-corrosion an |
---|---|
Bibliography: | Application Number: CN202122858610U |