Template for producing prefabricated floating tunnel

The utility model discloses a template for producing a prefabricated floating tunnel, which is used for flow production line operation and comprises a bottom supporting template, a top supporting template and a bottom supporting template, the bottom supporting template comprises a movable template,...

Full description

Saved in:
Bibliographic Details
Main Authors ZHANG WENYUAN, MO YASI, ZHAO HUI, XU LIXIN, JIANG FANGJING, JIN XIAOJUAN
Format Patent
LanguageChinese
English
Published 14.12.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model discloses a template for producing a prefabricated floating tunnel, which is used for flow production line operation and comprises a bottom supporting template, a top supporting template and a bottom supporting template, the bottom supporting template comprises a movable template, and the movable template is used for driving the prefabricated floating tunnel to move; the outer mold is arranged on the bottom supporting template, and the outer mold is controlled through mechanical equipment, so that mounting and dismounting of the outer mold are realized; an annular pouring cavity is formed by the outer mold and the inner mold, and the annular pouring cavity at least comprises a first pouring cavity body and a second pouring cavity body; a steel reinforcement cage is arranged in the annular pouring cavity and fixed to the movable formwork. And the inner supporting frame penetrates through a prefabricated production line to form an inner support, and the inner mold is supported on the inner sup
Bibliography:Application Number: CN202121097771U