Newly-built foundation upper and lower column connecting structure for expanding underground space

A newly-built foundation upper column and lower column connecting structure for expanding an underground space comprises an upper structure column (1) and a newly-built basement steel pipe concrete column (2) which are oppositely arranged, and four steel plates (3) connected end to end are pre-burie...

Full description

Saved in:
Bibliographic Details
Main Authors ZHOU JIANBO, WU BO, LIAO JIEHONG, LU LINGYUE, GAO ZUOPING, ZHANG CHANG
Format Patent
LanguageChinese
English
Published 08.01.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A newly-built foundation upper column and lower column connecting structure for expanding an underground space comprises an upper structure column (1) and a newly-built basement steel pipe concrete column (2) which are oppositely arranged, and four steel plates (3) connected end to end are pre-buried in the periphery of the lower portion of the upper structure column (1) and the periphery of the upper portion of the newly-built basement steel pipe concrete column (2). A high-strength inorganic grouting material (4) is poured into a space defined by the four steel plates (3), and the basement steel pipe concrete column (2) and the four steel plates (3) are welded into a whole. And implementation is convenient, and reliable connection force transmission between the upper column and the lowercolumn can be ensured. 一种用于扩展地下空间的新建基础上下柱连接结构,包括相对设置的上部结构柱(1)和新增的地下室钢管混凝土柱(2),所述上部结构柱(1)下部和新增的地下室钢管混凝土柱(2)上部四周预埋有首尾相接的四块钢板(3),该四块钢板(3)围成的空间内部浇筑有高强无机灌浆料(4),且地下室钢管混凝土柱(2)与四块钢板(3)焊接成整体。既便于实施,也能保证上下柱之间的连接传力可靠。
Bibliography:Application Number: CN202020138134U