Arbor planting pit structure for steep soil slope

The utility model discloses a soil steep slope arbor planting pit structure which comprises a planting pit vertically dug in a soil steep slope, a plurality of supporting steel bars are driven into the upper edge of the planting pit at intervals, the length of the supporting steel bars is 1-3 times...

Full description

Saved in:
Bibliographic Details
Main Authors CHEN WEIYU, TAI ZHAOYUE, ZHAO TONGYANG, WANG PENG, CHEN ZHIMIN, SHI LIN, FENG GUANGWEI, GUO YANAN, DING YU, HAN YAPING, HOU XIAOHUI, XING BAOLONG, WU YANFENG, SONG WENCHAO, NIU HEDAO, FAN LEI
Format Patent
LanguageChinese
English
Published 07.02.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model discloses a soil steep slope arbor planting pit structure which comprises a planting pit vertically dug in a soil steep slope, a plurality of supporting steel bars are driven into the upper edge of the planting pit at intervals, the length of the supporting steel bars is 1-3 times the depth of the planting pit, and steel pore plates are welded between the supporting steel bars arranged in the planting pit. PVC pore plates are arranged on the lower edge and the two side edges of the planting pit, and geotextile layers are laid on the inner sides of the PVC pore plates. According to the utility model, the stable planting pits are dug in the soil steep slope, then the arbor is planted for greening, and the planting pits are combined with grass planting, shrubs and the like which are conventionally planted, so that the diversity of plants on the slope surface of the soil steep slope and the level of greening planting are enriched, and the overall ecological landscape effect on the two sides of a
Bibliography:Application Number: CN201920822004U