Electric power cycle control testing arrangement
The utility model provides an electric power cycle control testing arrangement, it is used for testing a plurality of product, and this electric power cycle control testing arrangement includes: a power, a control unit, it includes: this switch is connected to a PLC module, a switch, a memory, a net...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | Chinese English |
Published |
22.02.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model provides an electric power cycle control testing arrangement, it is used for testing a plurality of product, and this electric power cycle control testing arrangement includes: a power, a control unit, it includes: this switch is connected to a PLC module, a switch, a memory, a network module and 1 the 1st IO port, this PLC module electricity earlier, and this power is connectedto this switch electricity of rethread, and this memory, this network module and a IO port are connected to this PLC module electricity respectively, a module able to programme, this PLC module is connected to its electricity, a test terminal, electric this the PLC module of connection of its one end, this product of other end electricity connection, this test terminal still are provided with 1 the 2nd IO port, and a IO port can be connected with the 2nd IO port electricity, and the direct transmission is connected for this PLC module to the electricity that this test terminal can pass throughthe test data who tests t |
---|---|
Bibliography: | Application Number: CN201821058433U |