Electric power cycle control testing arrangement

The utility model provides an electric power cycle control testing arrangement, it is used for testing a plurality of product, and this electric power cycle control testing arrangement includes: a power, a control unit, it includes: this switch is connected to a PLC module, a switch, a memory, a net...

Full description

Saved in:
Bibliographic Details
Main Author FU ZHONGCHENG
Format Patent
LanguageChinese
English
Published 22.02.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model provides an electric power cycle control testing arrangement, it is used for testing a plurality of product, and this electric power cycle control testing arrangement includes: a power, a control unit, it includes: this switch is connected to a PLC module, a switch, a memory, a network module and 1 the 1st IO port, this PLC module electricity earlier, and this power is connectedto this switch electricity of rethread, and this memory, this network module and a IO port are connected to this PLC module electricity respectively, a module able to programme, this PLC module is connected to its electricity, a test terminal, electric this the PLC module of connection of its one end, this product of other end electricity connection, this test terminal still are provided with 1 the 2nd IO port, and a IO port can be connected with the 2nd IO port electricity, and the direct transmission is connected for this PLC module to the electricity that this test terminal can pass throughthe test data who tests t
Bibliography:Application Number: CN201821058433U