Open cut station that utility tunnel integration development and subway construct altogether
Open cut station that utility tunnel integration development and subway construct altogether, including comprehensive section of piping lane platform, access & exit integration section, a section development space layer that sets gradually secret one deck from top to bottom, secret two layers su...
Saved in:
Main Authors | , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
20.11.2018
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Open cut station that utility tunnel integration development and subway construct altogether, including comprehensive section of piping lane platform, access & exit integration section, a section development space layer that sets gradually secret one deck from top to bottom, secret two layers subway station room layer and the subway platform layer of secret three -layer are synthesized to the piping lane platform, development space layer is concentrated in one side and is set up piping lane, as an organic wholeization of opposite side remainder development space, the access & exit is integrated period number and is set up in one side that the section is synthesized to the piping lane platform, and secret one deck development space layer sets up the integrated horizontal joint section passageway in the access & exit intercommunication access & exit integration section, and integration horizontal joint section passageway sets up the peripheral subway underground space of access & exit intercommunication, the su |
---|---|
Bibliography: | Application Number: CN20182517647U |