Rivers limit bank hole tubular energy dissipation bank protection
The utility model discloses a rivers limit bank hole tubular energy dissipation bank protection, arrange two calandrias on an po the place ahead riverbed including being on a parallel with the riverside bank, parallel interval sets up between two calandrias, the outstanding riverbed of the preceding...
Saved in:
Main Authors | , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
30.10.2018
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model discloses a rivers limit bank hole tubular energy dissipation bank protection, arrange two calandrias on an po the place ahead riverbed including being on a parallel with the riverside bank, parallel interval sets up between two calandrias, the outstanding riverbed of the preceding calandria height that is close to the riverbed central line is less than the height of keeping awayfrom the outstanding riverbed of calandria behind the river course central line, a plurality of energy dissipation holes have been seted up respectively on every body lateral wall. The utility modeldiscloses the advantage lies in that preceding, two calandrias of back that set up had both played the energy dissipation effect, has decomposed the flow of riverside bank top rush water again, through to the influence of rivers moderate degree, reaches protection river course bank slope purpose, and less to the river water environmental impact. It has increased protecting project's energy dissipation effect to set up a pl |
---|---|
Bibliography: | Application Number: CN20182389796U |