Prefabricated hollow terrace with edge formula milestone
Prefabricated hollow terrace with edge formula milestone being formed by the processing preparation of job site concrete waste material, and the shape be the cavity terrace with edge, and reflecting coating is applied paint with a brush to the outside, milestone side mark mileage scalar sum road nam...
Saved in:
Main Authors | , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
13.02.2018
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Prefabricated hollow terrace with edge formula milestone being formed by the processing preparation of job site concrete waste material, and the shape be the cavity terrace with edge, and reflecting coating is applied paint with a brush to the outside, milestone side mark mileage scalar sum road name, be fixed in road surface layer through expansion bolts on, the size be 120 of traditional cuboidmilestone, has that the appearance is small and exquisite, the portability is good, the waste recycling utilization, marks characteristics such as striking, handling ease installation.
预制空心棱台式里程碑,由施工现场混凝土废料加工制作而成,形状为中空棱台,外部涂刷反光涂料,里程碑侧面标记里程数和道路名称,通过膨胀螺栓固定于道路面层上,体型为传统长方体里程碑的1/20,具有外形小巧、便携性好、废料回收利用、标示醒目、便于加工安装等特点。 |
---|---|
Bibliography: | Application Number: CN20172811979U |