Quick detach, ready -package shear force wall be aluminium membrane instrument in flakes
The utility model provides a quick detach, ready -package shear force wall be aluminium membrane instrument in flakes belongs to shear force wall construction tool field, including shear force wall wall body and a plurality of formwork unit that sets gradually along shear force wall wall body direct...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | Chinese English |
Published |
11.05.2016
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model provides a quick detach, ready -package shear force wall be aluminium membrane instrument in flakes belongs to shear force wall construction tool field, including shear force wall wall body and a plurality of formwork unit that sets gradually along shear force wall wall body direction of height, the formwork unit includes two plank sheathings, and the stupefied inside and outside both sides of being fixed in shear force wall wall body are carried on the back through the flitch respectively to two plank sheathings, and the stupefied one side of keeping away from the plank sheathing of the flitch back of the body is provided with the steel pipe, and the formwork unit still includes the stagnant water screw rod, and it is stupefied that the steel pipe is fixed in the flitch back of the body through the stagnant water screw rod. The utility model provides a quick detach, ready -package shear force wall be aluminium membrane instrument in flakes can be fixed with the plank sheathing very firmly, |
---|---|
Bibliography: | Application Number: CN20152883340U |