Prefabricated inverted arch piece lining cutting structure of subway TBM worker method

Prefabricated inverted arch piece lining cutting structure of subway TBM worker method to effectively improve the efficiency of construction in TBM tunnel, reduce project cost under the prerequisite of security in guaranteeing the work progress. Including reinforced concrete structure's prefabr...

Full description

Saved in:
Bibliographic Details
Main Authors PENG JIANHAI, SHI XUANTAO, ZHANG ZENG, XU LIANG, HE XUSU, LUO SHIPEI, LI HUI, LI DECAI, XU QIAN, XU JIANXUAN, HU XIAOWEI, YUE YINGQIN, LIN GANG, CHEN JUN, ZHANG JIANXIANG, AO GUIYONG
Format Patent
LanguageChinese
English
Published 16.03.2016
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Prefabricated inverted arch piece lining cutting structure of subway TBM worker method to effectively improve the efficiency of construction in TBM tunnel, reduce project cost under the prerequisite of security in guaranteeing the work progress. Including reinforced concrete structure's prefabricated inverted arch piece, this prefabrication inverted arch piece outside has the arc section with the adaptation of tunnel excavation profile phase, and the inboard has the first step face that is located the middle part and is located the second step face outside the first horizontal both sides of step face. Longitudinal separation sets up TBM construction rail mounting hole on the first step face, and longitudinal separation sets up secondary lining construction rail mounting hole on the second step face.
Bibliography:Application Number: CN2015209721U