Construction structures of long piled wharf

The utility model relates to a long piled wharf field specifically is a construction structures of long piled wharf. This construction structures includes: pier cushion cap, the perpendicular stake in wharf apron, batter pile, middle perpendicular stake, specifically the structure is as follows: the...

Full description

Saved in:
Bibliographic Details
Main Authors ZHANG XINGGANG, QIU YULIN
Format Patent
LanguageChinese
English
Published 06.01.2016
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model relates to a long piled wharf field specifically is a construction structures of long piled wharf. This construction structures includes: pier cushion cap, the perpendicular stake in wharf apron, batter pile, middle perpendicular stake, specifically the structure is as follows: the bottom of pier cushion cap is close to wharf apron department and sets up the perpendicular stake in wharf apron, perpendicular stake in the middle of the bottom mid portion of pier cushion cap sets up, and the bottom outside of pier cushion cap sets up batter pile, and batter pile be the steel -pipe pile, forms the cooperation structure of perpendicular of batter pile and the perpendicular stake in wharf apron and centre. Perpendicular stake can only be made in the cast in situ concrete stake, adopts the precedent that does not have of steel -pipe pile. And the steel -pipe pile can make batter pile, and batter pile can control the translation of pier cushion cap effectively, has played most important effect to th
Bibliography:Application Number: CN20152747464U