Interim supporting platform of super high -rise building equipment

The utility model discloses an interim supporting platform of super high -rise building equipment, it includes crossbeam, longeron, bracing, landing leg, support, connecting rod and connecting bolt, crossbeam and longeron welding form braced frame, the landing leg welding is in braced frame's b...

Full description

Saved in:
Bibliographic Details
Main Authors MAO LICHEN, CAO YANMING, REN SHUHUA, ZHANG LEI, HOU WEI, ZHANG WEI
Format Patent
LanguageEnglish
Published 16.12.2015
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model discloses an interim supporting platform of super high -rise building equipment, it includes crossbeam, longeron, bracing, landing leg, support, connecting rod and connecting bolt, crossbeam and longeron welding form braced frame, the landing leg welding is in braced frame's bottom, the lateral part at the landing leg is welded to the one end of bracing, and the other end of bracing welds the bottom at crossbeam or longeron, the lower extreme welding of landing leg has the keysets, and the roof on the support passes through the bolt fastening with the keysets on the landing leg, and the bottom plate on the support welds the upper portion at the building construction roof beam, the crossbeam on the adjacent braced frame is connected to the connecting rod to it is fixed to use connecting bolt. The utility model provides an interim supporting platform of super high -rise building equipment, its simple structure, simple to operate under the uncompleted condition of building structure, utilizes perpendicular super high -rise building equipment to the equipment place layer of taking one's place of transporting of civil engineering tower crane, has solved the awkward situation that the perpendicular transportation of equipment is taken one's place among the super high -rise building, ensures the whole construction progress of building.
Bibliography:Application Number: CN20152409931U