Bulked binding material parallel-connection ash discharging system
The utility model relates to the technical field of transportation, in particular to a bulked binding material parallel-connection ash discharging system for the bulked binding material transshipping management in the construction of a large-sized hydropower station. The system comprises a bulked bi...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
30.01.2013
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model relates to the technical field of transportation, in particular to a bulked binding material parallel-connection ash discharging system for the bulked binding material transshipping management in the construction of a large-sized hydropower station. The system comprises a bulked binding material storage tank (1), a main pipeline system (2), an ash discharging branch pipe (3), an ash loading branch pipe (4) and a silo-side discharging connection port end (5). The bulked binding material parallel-connection ash discharging system adopts an advanced computer remote management mode, routine work in the traditional bulked binding material loading-unloading system is changed from the manual mode with large randomness to the standard computer operation mode, and a revolution of a work way is realized. In the bulked binding material loading-unloading system of the hydropower station, unattended operation or fewer attendants are realized through a unique way, so that the workload of the maintenance p |
---|---|
Bibliography: | Application Number: CN20122416720U |