Boarding production kinetic energy changeover mechanism
The utility model discloses a boarding production kinetic energy changeover mechanism, comprising an boarding tower and a gap bridge, wherein the boarding tower is vertically and fixedly provided with a first cable and a first pipeline; the lower end of the first cable is electrically connected with...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
13.07.2011
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The utility model discloses a boarding production kinetic energy changeover mechanism, comprising an boarding tower and a gap bridge, wherein the boarding tower is vertically and fixedly provided with a first cable and a first pipeline; the lower end of the first cable is electrically connected with a dockside power cabinet; the lower part of the first pipeline is communicated with a corridor pipeline; a valve interface is arranged at the upper part of the first pipeline; a changeover electric cabinet is fixed at the top of the boarding tower and is electrically connected with the other end of the first cable; the second cable is fixed at two sides of the gap bridge; one end of the second cable is electrically connected with the changeover electric cabinet, and the other end of the second cable extends to the prefixed position of a deck; the gap bridge is longitudinally and fixedly provided with a second pipeline; and a flange interface is arranged at one end of the second pipeline and is connected with the v |
---|---|
Bibliography: | Application Number: CN20102643638U |