Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete

The construction method of the present invention includes cutting stone into one block or two blocks to be assembled in the designed size, drilling holes for foundation bolts; hoisting the stone intothe foundation pit, back filling and densifying; fixing the foundation bolts; and assembling the pole...

Full description

Saved in:
Bibliographic Details
Main Author LUYU LU
Format Patent
LanguageEnglish
Published 25.09.2002
Edition7
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The construction method of the present invention includes cutting stone into one block or two blocks to be assembled in the designed size, drilling holes for foundation bolts; hoisting the stone intothe foundation pit, back filling and densifying; fixing the foundation bolts; and assembling the pole or tower in the method similar to fixing railway tracks. The said method can be used in construction electrical power pole and tower as well as other buildings in cold area in winter.
Bibliography:Application Number: CN2001145370