Electrical power pole and tower foundation construction mehtod by using raw stone to replace in-situ deposited concrete
The construction method of the present invention includes cutting stone into one block or two blocks to be assembled in the designed size, drilling holes for foundation bolts; hoisting the stone intothe foundation pit, back filling and densifying; fixing the foundation bolts; and assembling the pole...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | English |
Published |
25.09.2002
|
Edition | 7 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The construction method of the present invention includes cutting stone into one block or two blocks to be assembled in the designed size, drilling holes for foundation bolts; hoisting the stone intothe foundation pit, back filling and densifying; fixing the foundation bolts; and assembling the pole or tower in the method similar to fixing railway tracks. The said method can be used in construction electrical power pole and tower as well as other buildings in cold area in winter. |
---|---|
Bibliography: | Application Number: CN2001145370 |