Prestressed hollow combined structure tower drum based on steel pipe mortise and tenon joint connection and construction method

The invention discloses a prestressed hollow combined structure tower drum based on steel pipe tenon-and-mortise joint connection and a construction method. The prestressed hollow combined structure tower drum comprises a drum body, the drum body is formed by assembling a plurality of drum sections...

Full description

Saved in:
Bibliographic Details
Main Authors ZUO KAIYUAN, LIU GEJIA, YANG YONG, LIU XIANGYANG, ZHANG SHUCHEN, LI HUAYU
Format Patent
LanguageChinese
English
Published 28.02.2025
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a prestressed hollow combined structure tower drum based on steel pipe tenon-and-mortise joint connection and a construction method. The prestressed hollow combined structure tower drum comprises a drum body, the drum body is formed by assembling a plurality of drum sections in a segmented mode in the height direction, the adjacent drum sections are connected through steel pipe tenon-and-mortise joints, and the drum body is formed by connecting a plurality of hollow combined duct pieces through prestressed bent bolts in the annular direction. The hollow combined pipe piece comprises a hollow steel pipe, prestressed steel bars and a concrete shell. The steel pipe mortise and tenon joint comprises a concave tenon steel pipe, a convex tenon steel pipe, grouting materials and a PBL connecting piece welded to the outer wall of the convex tenon steel pipe. The advantages of a combined structure and a prestressed structure are exerted, the hollow steel pipes and the concrete are cooperatively
Bibliography:Application Number: CN202411869927