Arrangement method for stoping roadway of sequential mining working face back to goaf

The invention provides a sequential mining working face stoping roadway arrangement method back to a goaf, which comprises the following steps: tunneling a first working face air return crossheading, an open-off cut and a withdrawing channel, and reversely tunneling a first working face transportati...

Full description

Saved in:
Bibliographic Details
Main Authors DENG ZHIGANG, BI HUIJIE, LI SHAOGANG, WANG HONGWEI, MO YUNLONG, WANG JIANDA, WANG TENGFEI, TU QI, HAN LIN, SHEN JIANBO, LIU XING
Format Patent
LanguageChinese
English
Published 30.07.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a sequential mining working face stoping roadway arrangement method back to a goaf, which comprises the following steps: tunneling a first working face air return crossheading, an open-off cut and a withdrawing channel, and reversely tunneling a first working face transportation crossheading along the open-off cut of the first working face; extending and tunneling a second working face open-off cut from the first working face open-off cut, and reversely tunneling a second working face air return crossheading and a transportation crossheading; cutting hole extension of the second working face and tunneling operation of an air return crossheading are completed before stoping of the first working face, and tunneling operation of a transportation crossheading and a withdrawing channel of the second working face is completed in the stoping process of the first working face; and the steps from S2 to S4 are repeated, and the rest working faces are circularly operated in sequence. The next work
Bibliography:Application Number: CN202410704106