High-standard farmland ridge reinforcing measure and construction method thereof
The invention provides a high-standard farmland ridge reinforcement measure and a construction method thereof, and the method comprises the following steps: before the construction of a ridge, a total station is used for releasing the center line of the ridge; one iron nail is driven in along the ce...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
19.07.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a high-standard farmland ridge reinforcement measure and a construction method thereof, and the method comprises the following steps: before the construction of a ridge, a total station is used for releasing the center line of the ridge; one iron nail is driven in along the center line at certain intervals, and the side boundary of the field ridge is released according to each iron nail; surface sundries in the newly-built field ridge range are removed; pits generated by cleaning the sundries are densely filled with natural cohesive soil; the timber pile is pressed into the leveled and rolled soil; weaving bamboo canes on the timber piles on the two sides of the field ridge and fixing the bamboo canes; the outer sides of the double-row timber piles are backfilled with immature soil in a layered mode, the inner sides of the double-row timber piles are backfilled with semi-solidified soil in a layered mode till the designed height is reached, and finally building of the field ridge is com |
---|---|
Bibliography: | Application Number: CN202410364681 |