Well-ground combined long horizontal section dense fracturing gas rapid extraction method by replacing roadway with well

The invention discloses a well-ground combined long horizontal section dense fracturing gas rapid extraction method with a well replacing a roadway. The method comprises the steps that the deployment position of a horizontal well is determined; construction parameter design of the horizontal well is...

Full description

Saved in:
Bibliographic Details
Main Authors ZHANG JIE, MO HAITAO, WANG CHANGWEI, ZHU WENXIA, CHEN TIANZHU, XU YAOBO
Format Patent
LanguageChinese
English
Published 16.07.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a well-ground combined long horizontal section dense fracturing gas rapid extraction method with a well replacing a roadway. The method comprises the steps that the deployment position of a horizontal well is determined; construction parameter design of the horizontal well is completed according to the earlier-stage exploration data, and construction parameters comprise the length of a horizontal section, the position of a horizontal well end hole, the length of a stable inclination section and a stable inclination angle; drilling and completion construction of the horizontal well is completed; an underground long drill hole is constructed in the main roadway open-off cut position in the upward inclination direction of the horizontal section, and butt joint of the underground long drill hole and the horizontal section is completed; fracturing construction of the horizontal section is completed section by section; after flow-back is completed, drilling and washing are conducted on the h
Bibliography:Application Number: CN202410587687