LNG receiving station tower and torch mounting method
The invention discloses an LNG (Liquefied Natural Gas) receiving station tower and torch mounting method, which comprises the following steps: S1, preparing technical data and compiling a scheme; s2, checking and accepting the foundation; s3, carrying out secondary grouting on the tower foundation;...
Saved in:
Main Authors | , , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
14.06.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses an LNG (Liquefied Natural Gas) receiving station tower and torch mounting method, which comprises the following steps: S1, preparing technical data and compiling a scheme; s2, checking and accepting the foundation; s3, carrying out secondary grouting on the tower foundation; s4, the tower and the barrel are alternately installed to 58.7 m; s5, hoisting a torch head; s6, mounting a stable lifting guide, a rotary cantilever mast and a movable platform; s7, lifting, assembling and welding the barrel; s8, mounting a tower; s9, installing a guiding system; s10, alternately carrying out lifting installation until the installation is finished; s11, accessory pipelines and accessories are installed; and S12, the temporary platform, the cantilever mast and the lifting system are dismantled. The LNG receiving station tower and torch installation method is simple, convenient, flexible, easy to operate and high in assembly speed, it is also guaranteed that the follow-up installation welding proces |
---|---|
Bibliography: | Application Number: CN202410542862 |