Fabricated arched skeleton revetment and construction method thereof
The invention provides an assembly type arched framework protection slope and a construction method thereof. The construction method comprises a subgrade foundation trench accurate guiding and rapid excavation technology; an arc-shaped groove excavation guide frame technology is adopted; a sliding t...
Saved in:
Main Authors | , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
11.06.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides an assembly type arched framework protection slope and a construction method thereof. The construction method comprises a subgrade foundation trench accurate guiding and rapid excavation technology; an arc-shaped groove excavation guide frame technology is adopted; a sliding type precise guiding technology is adopted for assembly type framework installation; a six-edge block installation accurate guiding technology is adopted; a movable type automatic spraying health preserving technology is adopted; the invention relates to a top cast-in-place top sealing finalization template and a plastering slicking technology. The construction method comprises the main construction steps of (1) construction preparation, (2) foundation trench excavation, (3) framework transportation, (4) framework assembly, (5) hexagonal block laying, (6) cast-in-place capping and (7) spraying maintenance. Rapid construction of the arched framework slope protection can be achieved, the construction steps are simplif |
---|---|
Bibliography: | Application Number: CN202410513845 |