Local micro and extension precipitation construction method for deep foundation pit

The invention relates to a local micro and extension precipitation construction method for a deep foundation pit, which belongs to the technical field of building construction and comprises the following steps: S1, checking a line of the foundation pit; s2, positioning a water collecting well; s3, a...

Full description

Saved in:
Bibliographic Details
Main Authors MA XINYING, LIU HAITAO, YAN HAITAO, XUE SHAOYAN, ZHANG FENGYU, AN XUEBING
Format Patent
LanguageChinese
English
Published 28.05.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to a local micro and extension precipitation construction method for a deep foundation pit, which belongs to the technical field of building construction and comprises the following steps: S1, checking a line of the foundation pit; s2, positioning a water collecting well; s3, a water collecting well is excavated; s4, embedding a water suction pipe and an exhaust pipe; s5, a water suction pipe is connected with a self-priming pump; s6, a U-shaped PVC pipe is buried; s7, backfilling and covering a slurry-retaining plastic film; and S8, starting a self-priming pump to carry out precipitation operation. The device has the effects that the rainfall difficulty is reduced, and local minimization and extended rainfall are facilitated. 本申请涉及一种深基坑局部微型及延展降水施工工法,属于建筑施工技术领域,其包括以下步骤:S1:基坑验线;S2:集水井定位;S3:集水井开挖;S4:埋设吸水管、排气管;S5:将吸水管与自吸泵相连接;S6:埋设U型PVC管;S7:回填、上覆保浆塑料薄膜,S8:启动自吸泵即可进行降水作业。本申请具有降低降水难度、便于进行局部微型及延展降水的效果。
Bibliography:Application Number: CN202410204492