Temporary passage for pedestrians to pass through in groove construction

The invention discloses a temporary passage for pedestrians to pass through in groove construction, and relates to the technical field of pipeline construction, the temporary passage comprises a ground, a groove is formed in the top end of the ground, side slopes are fixedly arranged on the two side...

Full description

Saved in:
Bibliographic Details
Main Authors SHEN KANG, ZHAO QUAN, HE KUAN, LIU CHONG, LI FANGLI, ZHANG HUAWEI
Format Patent
LanguageChinese
English
Published 17.05.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a temporary passage for pedestrians to pass through in groove construction, and relates to the technical field of pipeline construction, the temporary passage comprises a ground, a groove is formed in the top end of the ground, side slopes are fixedly arranged on the two sides of the groove, and a supporting seat is fixedly arranged at the bottom end of the interior of the groove; supporting mechanisms are fixedly arranged at the top end of the supporting base in a front-back symmetry mode, supporting mechanisms are symmetrically arranged on the left side and the right side of each supporting mechanism, square steel pipe main beams are fixedly arranged at the top ends of the two supporting mechanisms correspondingly, and a plurality of square steel pipe secondary beams are fixedly arranged between the two square steel pipe main beams; a bottom plate is fixedly arranged at the top ends of the square steel pipe secondary beams, a safety channel is formed in the top end of the bottom plat
Bibliography:Application Number: CN202410278295