Single pile foundation one-time forming construction method
A one-time forming construction method for a single pile foundation comprises the steps that an inner pile casing and an outer pile casing are embedded before a pile hole is drilled, after drilling is completed, a reinforcement cage is hung in, concrete is poured, then the inner pile casing is moved...
Saved in:
Main Authors | , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
10.05.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A one-time forming construction method for a single pile foundation comprises the steps that an inner pile casing and an outer pile casing are embedded before a pile hole is drilled, after drilling is completed, a reinforcement cage is hung in, concrete is poured, then the inner pile casing is moved away, slurry in a pile head is cleared away through a pile head cleaner, then a formwork needed for pouring the pile head is installed, concrete is injected, and after the concrete of the pile head is solidified, the pile head is poured into the formwork; and the outer pile casing is moved away, the formwork is removed, and the ground is backfilled. According to the one-time forming construction method for the single-pile foundation, pouring construction of the whole pile body and the pile head of the engineering pile can be completed at a time, the construction period is greatly shortened, the construction difficulty is greatly lowered, the working efficiency is improved, and the problems of eccentricity, tiny se |
---|---|
Bibliography: | Application Number: CN202311671754 |