Construction control method for small-distance tunnel obliquely penetrating muck accumulation body side slope

The invention discloses a construction control method for a small-clear-distance tunnel obliquely penetrating through a muck accumulation body side slope. The construction control method comprises the following steps that (1) a tunnel 3D model is constructed through FLAC3D; 2) initializing construct...

Full description

Saved in:
Bibliographic Details
Main Authors YANG ZHONGFENG, MA GUOSONG, XIE BIN, SHI WENTAO, ZHANG XUE, YANG QINGGUO, GAO TIAN
Format Patent
LanguageChinese
English
Published 05.04.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a construction control method for a small-clear-distance tunnel obliquely penetrating through a muck accumulation body side slope. The construction control method comprises the following steps that (1) a tunnel 3D model is constructed through FLAC3D; 2) initializing construction parameters of an advanced pipe shed support; (3) construction of an advanced pipe shed support is simulated in the tunnel 3D model; (4) simulating the tunnel excavation process in an underground excavation hole entering mode, and calculating the soil displacement of the current tunnel underground excavation hole entering section; (2) judging whether the soil displacement of the current tunnel underground excavation tunnel entering section is larger than a preset displacement threshold value d or not, if yes, modifying the construction parameters of the advance pipe shed support and returning to the step (2), and if not, outputting the optimal construction parameters of the advance pipe shed support; and (5) on
Bibliography:Application Number: CN202410086533