Construction control method for small-distance tunnel obliquely penetrating muck accumulation body side slope
The invention discloses a construction control method for a small-clear-distance tunnel obliquely penetrating through a muck accumulation body side slope. The construction control method comprises the following steps that (1) a tunnel 3D model is constructed through FLAC3D; 2) initializing construct...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
05.04.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a construction control method for a small-clear-distance tunnel obliquely penetrating through a muck accumulation body side slope. The construction control method comprises the following steps that (1) a tunnel 3D model is constructed through FLAC3D; 2) initializing construction parameters of an advanced pipe shed support; (3) construction of an advanced pipe shed support is simulated in the tunnel 3D model; (4) simulating the tunnel excavation process in an underground excavation hole entering mode, and calculating the soil displacement of the current tunnel underground excavation hole entering section; (2) judging whether the soil displacement of the current tunnel underground excavation tunnel entering section is larger than a preset displacement threshold value d or not, if yes, modifying the construction parameters of the advance pipe shed support and returning to the step (2), and if not, outputting the optimal construction parameters of the advance pipe shed support; and (5) on |
---|---|
Bibliography: | Application Number: CN202410086533 |