Manual hole digging pile construction method
The invention provides a manual hole digging pile construction method, belongs to the technical field of hole pile construction, and comprises the steps of pile position positioning measurement and locking opening construction, hole opening arrangement, pile hole excavation, deslagging transportatio...
Saved in:
Main Authors | , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
05.04.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention provides a manual hole digging pile construction method, belongs to the technical field of hole pile construction, and comprises the steps of pile position positioning measurement and locking opening construction, hole opening arrangement, pile hole excavation, deslagging transportation, final hole detection, steel bar engineering construction, pile foundation concrete pouring, pile head breaking and removal, pile foundation detection and construction completion. The overall construction progress is greatly improved through rapid construction of the steel bars, meanwhile, automatic steel bar welding is conducted on the construction flow, the steel bar welding quality is guaranteed, the pile steel bar engineering quality is guaranteed, the excavation progress can be accelerated through a rapid excavation mode of a movable bottom bucket in the excavation composition, the pile body is automatically detected, and the construction efficiency is improved. And the construction quality is better ensured |
---|---|
Bibliography: | Application Number: CN202311669455 |