Wind power arm installation method

The invention provides a wind power arm installation method. The wind power arm installation method comprises the following steps that S1, a main suspension arm is installed, and the main suspension arm is horizontally placed on a to-be-installed surface; s2, a wind power arm, a front pull rod and a...

Full description

Saved in:
Bibliographic Details
Main Authors WEI YONG, MA XIAOTENG, LIANG JIANBO, YANG XIANFU, HU QIHONG, LIU CAILIANG, LU WANG, MIAO DEYU
Format Patent
LanguageChinese
English
Published 02.04.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a wind power arm installation method. The wind power arm installation method comprises the following steps that S1, a main suspension arm is installed, and the main suspension arm is horizontally placed on a to-be-installed surface; s2, a wind power arm, a front pull rod and a rear pull rod are pre-installed; s3, the wind power arm and the main suspension arm are installed, and one end of the wind power arm is installed at the upper end of the main suspension arm; s4, wind power arm working condition electrical wiring; s5, supporting rod installation, wherein a supporting rod is installed at the joint of the wind power arm and the main suspension arm; s6, connecting front and rear pull pipes of the wind power arm; s7, the supporting rod is pulled up through the auxiliary crane; according to the wind power arm installation method, through mutual cooperation of all the steps, the convenience of wind power arm installation is improved, meanwhile, scenes needed by construction are reduced,
Bibliography:Application Number: CN202311854501