Construction method for backfilling fertilizer groove
The invention belongs to the technical field of urban construction equipment, and particularly relates to a construction method for backfilling a fertile groove, which comprises the following steps: S1, cleaning a base; S2, surveying and setting out: setting a horizontal mark by adopting a mode of s...
Saved in:
Main Authors | , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
26.03.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention belongs to the technical field of urban construction equipment, and particularly relates to a construction method for backfilling a fertile groove, which comprises the following steps: S1, cleaning a base; S2, surveying and setting out: setting a horizontal mark by adopting a mode of snapping a line on an outer wall surface of a basement so as to control the pouring height and thickness; s3, layered pouring is conducted through a pumping truck; performing layered circulating pouring by utilizing the flow-state solidified soil; S4, performing a sampling test; s5, finishing and leveling; after pouring of the last layer is completed, surface stay wire leveling is conducted, the place exceeding the standard elevation is leveled in time according to a line, and the place lower than the standard elevation is supplemented with materials and leveled; s6, pouring is completed; and after pouring is completed, maintenance is conducted for seven days, and then upper operation construction is conducted.
本发明属 |
---|---|
Bibliography: | Application Number: CN202311754246 |