Construction method for backfilling fertilizer groove

The invention belongs to the technical field of urban construction equipment, and particularly relates to a construction method for backfilling a fertile groove, which comprises the following steps: S1, cleaning a base; S2, surveying and setting out: setting a horizontal mark by adopting a mode of s...

Full description

Saved in:
Bibliographic Details
Main Authors YUE TONGKUN, WANG XIANGYUAN, WANG MINGTAO, MENG YANG, WEN ZHE, ZHANG HAITAO, LIAO LANHAO, FANG JIE, WANG ZIWEI, WANG LANTAO, MA XIAOBAO, ZHANG ZHIKAI, LI LIANGSEN, LIU XUEMEI
Format Patent
LanguageChinese
English
Published 26.03.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention belongs to the technical field of urban construction equipment, and particularly relates to a construction method for backfilling a fertile groove, which comprises the following steps: S1, cleaning a base; S2, surveying and setting out: setting a horizontal mark by adopting a mode of snapping a line on an outer wall surface of a basement so as to control the pouring height and thickness; s3, layered pouring is conducted through a pumping truck; performing layered circulating pouring by utilizing the flow-state solidified soil; S4, performing a sampling test; s5, finishing and leveling; after pouring of the last layer is completed, surface stay wire leveling is conducted, the place exceeding the standard elevation is leveled in time according to a line, and the place lower than the standard elevation is supplemented with materials and leveled; s6, pouring is completed; and after pouring is completed, maintenance is conducted for seven days, and then upper operation construction is conducted. 本发明属
Bibliography:Application Number: CN202311754246