Train track distribution optimization method for double-harness railway container center station

The invention provides a double-harness railway container center station train track distribution optimization method. The method comprises the steps of building a train-track distribution model in a double-harness railway container center station, generating an initial feasible solution and solving...

Full description

Saved in:
Bibliographic Details
Main Authors PEI YANSEN, WANG LI, ZHU, ZHAONING
Format Patent
LanguageChinese
English
Published 15.03.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a double-harness railway container center station train track distribution optimization method. The method comprises the steps of building a train-track distribution model in a double-harness railway container center station, generating an initial feasible solution and solving an algorithm. The invention provides a train-track distribution optimization method for a double-harness railway container center station, and the method comprises the steps: building an integer programming model by taking the minimization of the workload difference of track gantry cranes between harnesses and the transfer number in a container field as targets in consideration of the constraints of the space-time capacity of a track, the arrival and departure time requirement of a train, the loading and unloading operation requirement and the like; and optimizing the'train-track 'distribution of the double-harness railway container center station. 本发明提供了一种双线束铁路集装箱中心站列车轨道分配优化方法,包括:双线束集装箱中心站内的"列车-轨道"分配模型构建、生成初始可行解、
Bibliography:Application Number: CN202311743868