Joint optimization scheduling method and system for multiple cascade power stations

The invention discloses a joint optimization scheduling method and system for multiple cascade power stations, and the method comprises the steps: determining a corresponding station-level drainage basin region for any cascade power station in combination with the position information of each cascad...

Full description

Saved in:
Bibliographic Details
Main Authors CHEN CI, FAN YUXUN, LIU WEI, LIU BIAOYIN, ZHU HUA, CHEN CHAO, ZONG WEI, ZHOU LUN
Format Patent
LanguageChinese
English
Published 05.03.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a joint optimization scheduling method and system for multiple cascade power stations, and the method comprises the steps: determining a corresponding station-level drainage basin region for any cascade power station in combination with the position information of each cascade power station; according to the upstream and downstream relation and the corresponding station-level drainage basin areas, the incoming water prediction amount of any cascade power station in the short-term period is determined in sequence; according to the current water level data of any cascade power station and the corresponding incoming water predicted amount, determining a predicted water head of any cascade power station in a short-term period; establishing a short-term generating capacity maximum model according to the predicted water head of each cascade power station; and on the basis of the established short-term generating capacity maximum model, solving the optimized output of each cascade power stati
Bibliography:Application Number: CN202311668521