Quality supervision method and system for cast-in-place pile hidden project

The invention discloses a quality supervision method and system for a cast-in-place pile hidden project, and the method carries out the registration of design data of a cast-in-place pile reinforcement cage, carries out the registration and management of the receiving and inspection of a reinforceme...

Full description

Saved in:
Bibliographic Details
Main Authors LI ZHECONG, ZHU AO, CHEN JIANFENG, YE ZHEHAO, ZHOU CHUNXIAO, HUANG FEIYA
Format Patent
LanguageChinese
English
Published 01.03.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a quality supervision method and system for a cast-in-place pile hidden project, and the method carries out the registration of design data of a cast-in-place pile reinforcement cage, carries out the registration and management of the receiving and inspection of a reinforcement raw material, associates a corresponding material receiving record, and achieves the quality traceability management of the receiving, entering and inspection of the reinforcement. By registering construction data in the lowering construction process of the cast-in-place pile reinforcement cage, the construction data can be compared with design data, and abnormal use of the reinforcement can be identified; by summarizing and counting the steel bar consumption of the main bar, the spiral stirrup and the stiffening stirrup of each cast-in-place pile corresponding to the steel bar model and specification, and comparing with the detection representative number of the associated steel bar raw material detection repor
Bibliography:Application Number: CN202311621513