Prefabricated air duct mounting method based on BIM (Building Information Modeling)

The invention discloses a BIM (Building Information Modeling)-based prefabricated air duct mounting method, which comprises the following steps of: establishing an electromechanical mounting model of an air duct based on BIM, and performing duct comprehensive adjustment; fixing the base; the base is...

Full description

Saved in:
Bibliographic Details
Main Authors MA PENG, MENG XIAOHUAN, JIA DONGPO, SI TAOJIE, ZHOU KAIBO, ZHANG JIANHUI, YI XINGFU, FENG GUANGZONG, QIU SHUAI, YAN YAPENG, LIU SHUN
Format Patent
LanguageChinese
English
Published 01.03.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a BIM (Building Information Modeling)-based prefabricated air duct mounting method, which comprises the following steps of: establishing an electromechanical mounting model of an air duct based on BIM, and performing duct comprehensive adjustment; fixing the base; the base is connected with the pull rod; the prefabricated sleeve is connected with the pull rod; building a wall body, wherein the wall body is supported around the prefabricated sleeve; the air pipe penetrates into the prefabricated sleeve and is temporarily fixed; a permanent support is placed in a gap between the prefabricated sleeve and the air pipe; the permanent support is supported between the prefabricated sleeve and the air pipe; the air bag is stuffed into a gap between the prefabricated sleeve and the air pipe, and the gap is completely filled with the air bag through inflation; and the gap is filled with a fireproof blocking material. The method has the beneficial effects that based on the BIM technology, the pos
Bibliography:Application Number: CN202311617147