Prefabricated air duct mounting method based on BIM (Building Information Modeling)
The invention discloses a BIM (Building Information Modeling)-based prefabricated air duct mounting method, which comprises the following steps of: establishing an electromechanical mounting model of an air duct based on BIM, and performing duct comprehensive adjustment; fixing the base; the base is...
Saved in:
Main Authors | , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
01.03.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a BIM (Building Information Modeling)-based prefabricated air duct mounting method, which comprises the following steps of: establishing an electromechanical mounting model of an air duct based on BIM, and performing duct comprehensive adjustment; fixing the base; the base is connected with the pull rod; the prefabricated sleeve is connected with the pull rod; building a wall body, wherein the wall body is supported around the prefabricated sleeve; the air pipe penetrates into the prefabricated sleeve and is temporarily fixed; a permanent support is placed in a gap between the prefabricated sleeve and the air pipe; the permanent support is supported between the prefabricated sleeve and the air pipe; the air bag is stuffed into a gap between the prefabricated sleeve and the air pipe, and the gap is completely filled with the air bag through inflation; and the gap is filled with a fireproof blocking material. The method has the beneficial effects that based on the BIM technology, the pos |
---|---|
Bibliography: | Application Number: CN202311617147 |