Highway ultrahigh mitigation section drainage system based on longest catchment path and setting method

The invention relates to the technical field of road engineering, in particular to a longest catchment path-based arrangement method of a highway ultrahigh mitigation section drainage system, which comprises the following steps of: performing field investigation; simplifying the maximum catchment pa...

Full description

Saved in:
Bibliographic Details
Main Authors CHEN JIANGCAI, WEI DI, YAN ZENAN, HUANG XIAOFENG, XIE CHENG, ZHOU HUAIDE
Format Patent
LanguageChinese
English
Published 01.03.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention relates to the technical field of road engineering, in particular to a longest catchment path-based arrangement method of a highway ultrahigh mitigation section drainage system, which comprises the following steps of: performing field investigation; simplifying the maximum catchment path into a plane quadratic curve, and establishing a plane coordinate system by taking a point where the maximum catchment path enters the ponding area as an original point O, taking the direction of a path center line of the point O as an X axis and taking the direction of a vertical path center line as a Y axis; determining the position of a starting point A of the maximum catchment path; deducing a quadratic curve of the maximum catchment path according to the coordinates of the point A and the point O and the derivative of the maximum catchment path curve at the point O; and determining the number of the intercepting grooves according to the longest catchment path and determining the setting angles of the interc
Bibliography:Application Number: CN202311463307