Construction hanging basket operation risk real-time monitoring method and system
The invention relates to the technical field of data processing, in particular to a construction hanging basket operation risk real-time monitoring method and system.The method comprises the steps that historical inclination time sequence data of a construction hanging basket in the operation proces...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
23.01.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to the technical field of data processing, in particular to a construction hanging basket operation risk real-time monitoring method and system.The method comprises the steps that historical inclination time sequence data of a construction hanging basket in the operation process is obtained, and normalization processing is conducted on the historical inclination time sequence data; the obtained normalized historical gradient time series data are used as target time series data; acquiring marked data points in the target time sequence data; classifying the marked data points to obtain corresponding classification results; obtaining an ACF correlation coefficient graph of the target time series data, and obtaining a lag order of each data point in the target time series data according to the ACF correlation coefficient graph and the classification result; according to the method, the optimal ARMA model is fitted according to the lag order of each data point in the target time sequence data |
---|---|
Bibliography: | Application Number: CN202311765462 |