Small-section synchronous ore caving subsequent filling recovery process for top and bottom pillar residual ore resources
The invention discloses a top and bottom pillar residual ore resource small-section synchronous ore caving subsequent filling recovery process. The method relates to the technical field of mining, and comprises the following steps: S1, dividing the middle section of an ore body into a top pillar and...
Saved in:
Main Authors | , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
12.01.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses a top and bottom pillar residual ore resource small-section synchronous ore caving subsequent filling recovery process. The method relates to the technical field of mining, and comprises the following steps: S1, dividing the middle section of an ore body into a top pillar and a bottom pillar; S2, carrying out full-tailing cemented filling on a goaf below the top pillar; s3, an outside-vein roadway is arranged at the position, a certain distance away from the footwall of the ore body, of the middle section, a draw shaft communicated with the lower middle section is arranged beside the outside-vein roadway, a stope connection way is arranged at the position of a column between the outside-vein roadway, and then a top column rock drilling roadway parallel to the inside-vein roadway is arranged; s4, the top and bottom columns are divided into two small sections on the vertical face, and upward fan-shaped shallow holes are drilled in the two small section roadways respectively; s5, blasting |
---|---|
Bibliography: | Application Number: CN202311617034 |