Small-section synchronous ore caving subsequent filling recovery process for top and bottom pillar residual ore resources

The invention discloses a top and bottom pillar residual ore resource small-section synchronous ore caving subsequent filling recovery process. The method relates to the technical field of mining, and comprises the following steps: S1, dividing the middle section of an ore body into a top pillar and...

Full description

Saved in:
Bibliographic Details
Main Authors WANG LEI, E YUQIANG, ZENG LINGYI, LI YUNSHENG, LI XINWEI, LIU ZEZHOU, WANG DONGDONG, FANG XIANHUI, LIAO JIUBO, WEN HUISHAO, PENG BIN, XIONG PENG, LIU ZHIJUN, LI KUN
Format Patent
LanguageChinese
English
Published 12.01.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a top and bottom pillar residual ore resource small-section synchronous ore caving subsequent filling recovery process. The method relates to the technical field of mining, and comprises the following steps: S1, dividing the middle section of an ore body into a top pillar and a bottom pillar; S2, carrying out full-tailing cemented filling on a goaf below the top pillar; s3, an outside-vein roadway is arranged at the position, a certain distance away from the footwall of the ore body, of the middle section, a draw shaft communicated with the lower middle section is arranged beside the outside-vein roadway, a stope connection way is arranged at the position of a column between the outside-vein roadway, and then a top column rock drilling roadway parallel to the inside-vein roadway is arranged; s4, the top and bottom columns are divided into two small sections on the vertical face, and upward fan-shaped shallow holes are drilled in the two small section roadways respectively; s5, blasting
Bibliography:Application Number: CN202311617034