Outer formwork fixing method for tunnel open cut tunnel lining concrete pouring
The invention discloses an outer formwork fixing method for tunnel open cut tunnel lining concrete pouring. The method comprises the steps that A1, a lining trolley is built at the position where a lining is located, and a lining inner formwork is connected to the lining trolley; a3, lining reinforc...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
12.01.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention discloses an outer formwork fixing method for tunnel open cut tunnel lining concrete pouring. The method comprises the steps that A1, a lining trolley is built at the position where a lining is located, and a lining inner formwork is connected to the lining trolley; a3, lining reinforcement cage binding: the lining reinforcement cage is built, and the lining reinforcement cage is supported on the lining inner mold through inner side concrete thickness positioning blocks, A4, lining outer mold building: outer mold strips are supported on the lining reinforcement cage through outer side concrete thickness positioning blocks, and the lining outer mold is built; the outer mold fixing ribs are pressed on the lining outer mold, the two pairs of outer mold fixing ribs are arranged in the pressing strip via holes in a penetrating mode, the outer mold fixing ribs are tensioned for the first time by locking the tightening nuts, and the pressing nuts are sequentially tightened from the middle of the outer |
---|---|
Bibliography: | Application Number: CN202311340825 |