Segmented transformation transition construction method for line shape of business line

The sectional transformation transition construction method for the line shape of the business line comprises the steps that firstly, a construction section and a transition section are arranged, and the length of the transition section is determined; then a linear transition adjustment scheme of th...

Full description

Saved in:
Bibliographic Details
Main Authors WANG WEI, LIU YI, LI YANGYANG, LU SHEN, GUAN XINQUAN, CHEN ZHIYUAN, MO GANGHUA, WEI HAIJIN, TIAN QING, CAO ZHENGQING
Format Patent
LanguageChinese
English
Published 09.01.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The sectional transformation transition construction method for the line shape of the business line comprises the steps that firstly, a construction section and a transition section are arranged, and the length of the transition section is determined; then a linear transition adjustment scheme of the transition section is determined, and linear transition adjustment of the transition section is carried out; determining a secondary adjustment scheme of the line shape of the transition section, and carrying out secondary adjustment on the line shape of the transition section; and finally carrying out transformation construction on the ballast bed in the transition section. Segmented transformation is performed on the line shape of the business line at the skylight point, and the line shape of the transition section is adjusted, so that the transformed previous construction section and the existing later construction section are in track sequential connection, and the purpose of completing transformation under t
Bibliography:Application Number: CN202311342582