Uranium mine area polluted water and soil remediation scheme screening method based on multi-objective decision
The invention relates to a uranium mine area polluted water and soil remediation scheme screening method based on a multi-objective decision. The method comprises the steps of performing uranium mine area polluted site source item and site feature investigation; dividing pollution types of the pollu...
Saved in:
Main Authors | , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
22.12.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The invention relates to a uranium mine area polluted water and soil remediation scheme screening method based on a multi-objective decision. The method comprises the steps of performing uranium mine area polluted site source item and site feature investigation; dividing pollution types of the polluted sites of the uranium mine area and determining corresponding remediation technologies; constructing a key index structure of the uranium mine area polluted water and soil combined remediation technology, and calculating key index importance; the uranium mine area polluted water and soil combined remediation deviation degree is established; and screening the repairing materials of the polluted site in the uranium mine area. By adopting the uranium mine area polluted water and soil remediation scheme screening method based on the multi-objective decision, uranium mine area polluted site remediation technology screening can be standardized through a perfect process, and the decision process is objective and intell |
---|---|
Bibliography: | Application Number: CN202311009553 |