Construction method for integral concrete base of landscape footpath

The invention discloses a construction method of an integral concrete base of a landscape footpath. The construction method comprises the following steps: (1) surveying and setting out; (2) prefabricating a framework and constructing; (3) manufacturing footpath plates; according to the construction...

Full description

Saved in:
Bibliographic Details
Main Authors XIAO JING, REN WEICHAO, WANG MENGMENG, TANG JIANZHONG, LIU SHILIN, CAI LIANG
Format Patent
LanguageChinese
English
Published 22.12.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a construction method of an integral concrete base of a landscape footpath. The construction method comprises the following steps: (1) surveying and setting out; (2) prefabricating a framework and constructing; (3) manufacturing footpath plates; according to the construction method, the steps are simple, construction of the landscape footpath concrete integral base is facilitated, mounting and dismounting are convenient, later maintenance is facilitated, meanwhile, rainwater leakage can be collected, unified collection treatment is facilitated, and the utilization rate of water resources is greatly increased. 本发明公开了景观步道混凝土整体底座施工方法,包括如下步骤:1)测量放样、2)预制骨架并施工、3)步道板制作和4)步道板拼接。本发明的施工方法步骤简单,不仅便于景观步道混凝土整体底座的施工,而且安装拆卸方便,便于后期的维修,同时可以使雨水渗漏收集,便于统一收集处理,大大提高了水资源的利用率。
Bibliography:Application Number: CN202311203158