Gymnasium roof steel structure mounting method

The invention provides a gymnasium roof steel structure installation method. The gymnasium roof steel structure installation method comprises the steps that S1, a steel structure is transported to a site; s2, steel column installation is conducted, and secondary grouting is conducted on steel column...

Full description

Saved in:
Bibliographic Details
Main Authors LI ZHANGRONG, DING HANLONG, ZOU WENTAO, JIAO YUMING, ZHU JINMAN, LI NING, YANG YUHAO, SUN JIARUI, LIN XIONG, JIANG QI, WANG CANHUI, LI XIAOPENG, WANG ANHUI, SI HANXU, WANG XI
Format Patent
LanguageChinese
English
Published 24.11.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a gymnasium roof steel structure installation method. The gymnasium roof steel structure installation method comprises the steps that S1, a steel structure is transported to a site; s2, steel column installation is conducted, and secondary grouting is conducted on steel column bottom feet; s3, pre-deformation values are reserved during machining and lofting of all splicing units of the truss, and trial hoisting is carried out after splicing is completed; s4, the main truss on one side of the opening and closing opening of the gymnasium is installed firstly, then the main truss on the other side of the opening and closing opening of the gymnasium is installed, and S5, prestressed inhaul cable construction is conducted after roof steel structure construction is completed. Steel columns used for supporting the main trusses are adjusted through nuts, secondary pouring is conducted after adjustment, so that the assembling accuracy and stability of the main trusses are guaranteed, a hoisting
Bibliography:Application Number: CN202311131005