Method for arranging slope type adjustable heavy-load wharf

The invention discloses a method for arranging a slope type adjustable heavy-load wharf, which comprises the following steps of: 1, when the annual water level is the lowest water level, building a slope type wharf foundation or building an adjustable heavy-load wharf by using the original slope typ...

Full description

Saved in:
Bibliographic Details
Main Authors WANG DALONG, FU LIBO, SONG ENLEI, ZHAO ZHENXIANG, ZOU LEI, FU ZHENDONG, FU XIAOQIANG, LUO DANFENG, LUO ZHONGHUA, WANG GUOHUA
Format Patent
LanguageChinese
English
Published 21.11.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a method for arranging a slope type adjustable heavy-load wharf, which comprises the following steps of: 1, when the annual water level is the lowest water level, building a slope type wharf foundation or building an adjustable heavy-load wharf by using the original slope type wharf; 2, loading and unloading equipment; 3, adjusting the height of the wharf; according to the method, segmented transportation of ultra-large equipment is avoided, and the ship unloading efficiency is improved. According to the method, the heavy-load wharf can be rapidly moved in the track laying direction through the power system when the water level changes, so that the height of the heavy-load wharf is adjusted, and it is guaranteed that the height of the wharf is consistent with that of a ship deck. 本发明公开了一种设置斜坡式可调节重载码头的方法,包括以下步骤:步骤一、当全年水位处于最低水位时修建斜坡式码头基础或利用原有斜坡式码头,进行可调节重载码头的修建;步骤二、装卸设备;步骤三、调整码头高度;本方法避免了超大型设备的分段运输,提高了卸船效率。本方法可根据水位变化,在水位变化时通过动力系统沿轨道铺设方向快速移动重载码头,以调整重载码头高度,保障码头高度与船舶甲板面高度一致。
Bibliography:Application Number: CN202311270815