Load shedding test unit for double-extraction reheating back pressure unit

The invention discloses a load shedding test unit for a double-extraction reheating backpressure unit, and relates to the technical field of automatic control of thermal power generating units, the load shedding test unit comprises a boiler, a main steam port of the boiler is connected with a bypass...

Full description

Saved in:
Bibliographic Details
Main Authors SUN YONGBIN, WANG LI, LIU TIANYU, YU HAO, KANG RUITING, TANG HAOYUAN, LI CUNHUAI
Format Patent
LanguageChinese
English
Published 24.10.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a load shedding test unit for a double-extraction reheating backpressure unit, and relates to the technical field of automatic control of thermal power generating units, the load shedding test unit comprises a boiler, a main steam port of the boiler is connected with a bypass regulating valve through a pipeline, and the bypass regulating valve is connected to a recooling system of the boiler through a pipeline; high-pressure adjusting doors are arranged on the two sides of the high-pressure cylinder respectively, and the main steam opening is connected with the high-pressure adjusting doors; medium-pressure adjusting doors are arranged on the two sides of the medium-pressure cylinder respectively, a reheat steam opening and the medium-pressure adjusting doors of the boiler are connected with the high-pressure deaerator, and a four-section steam extraction opening of the medium-pressure cylinder, the high-pressure deaerator, the water feeding pump and the water inlet side of the boiler
Bibliography:Application Number: CN202310882343